Conventional sequence
Build the hangar, then equip it — too slow for an inbound squadron.
Step 01
Hangar built
Step 02
Facility measured
Step 03
Access equipment engineered
Step 04
Squadron arrives
This project
Engineered from plans first, installed once the hangar was complete.
Step 01
Access equipment engineered
Step 02
Hangar built
Step 03
System installed
Step 04
Squadron arrives
JE's step moved to the front of the sequence — engineered from plans, installed once the hangar was complete.